Fouling or performance prediction

Forecast duty loss on exchangers and similar equipment from existing historian data.

From $2,000 for a typical scope

Discuss this service

“Performance drifts over time”

Exchangers lose duty gradually, and cleaning crews need notice. The question is whether your existing data gives useful warning, and whether a model does better than the rule you use today.

A good fit when

  • One to three exchangers or similar assets to start with
  • Twelve to twenty-four months of history
  • A cleaning or maintenance decision with a measurable cost

How the work runs

Timing is a planning estimate, confirmed after the first stage.

WhenWorkYou can review
Week 1Tag mapping, unit checks and heat-balance auditData-quality report and go/no-go decision
Weeks 2–3Clean-state model, campaign boundaries and simple baselinesBaseline report and frozen test split
Weeks 3–5Fit and calibrate models on held-out periods and assetsErrors, misses, false alarms and band widths
Weeks 5–6Review failed forecasts with process and maintenance engineersFailure atlas and rules for when not to forecast
Weeks 6–8If justified, run shadow forecasts from a read-only feedTime-stamped predictions and review log

What we need

  • Inlet and outlet temperatures on both streams
  • Both stream flows, with units and basis
  • Exchanger area, arrangement and design clean performance
  • Cleaning records and known operating changes
  • Pressure drop, where available

What you keep

  • Clean-state thermal model and fouling estimate, with assumptions
  • Versioned forecasting pipeline
  • Baseline comparison and calibration report
  • Failure atlas covering missing data, drift and unfamiliar operation
  • Decision note: proceed, narrow the scope or stop

Agreed before we start

  • Planning lead time and duty floor
  • Maximum missed events and false alarms per month
  • Useful timing tolerance and maximum useful uncertainty
  • Minimum number of held-out campaigns

When we’d stop

Too few cleaning cycles, unmetered bypasses or poor sensor agreement can make a narrower monitoring study the right first step.